KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  8-7-2020
Number of Hours:  4.10
Manual Reference:  
Brief Description:  42NiS-04

08/07/20 4.1Hrs

1: ES-00301 was installed above the lightening hole in the F-01207B-1.
2: ES-00301 was riveted to F-01207B-1.
3: Aft pitot line was cut to 24" extended forward of the forward most plastic tie wrap.
4: F-00216 was routed and its end was inserted into the FLF-00007 in the static port.
5,6: F-00212 was routed forward through the lightening hole F-01207B-1 and its end was inserted into the FLF-00007 in the AOA port.
7: PT 1/4 OD Tube was cut to 103.5" to fabricate to the F-00214.
8: F-00214 was routed and its end was inserted into the FLF-00007 in the Pitot port
9: F-00212, F-00214, F-00216 were loosely secure to the ES-00301 using a tie wrap.
10: 15 Pin d-sub and 9 pin d-sub were connected to the GSU-25.
11: The wires (ADAHRS connectors) were loosely secure to the ES-00301 using a tie wrap.
12: It was checked that F-00212, F-00214, F-00216 were not chafing or rubbing on the fligh controls, torque tube or surrounding structure.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.