KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  8-6-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  42NiS-03

08/06/20 1.5Hrs

1: the F-01206E-1 was removed.
2: Final drill #11 was made the 4 holes of the F-01206E-1
3: F-00082 was riveted to the F-01206E-1.

08/06/20 2.5Hrs

4: The GSU 25 was bolted to the ADAHRS Baggage flour.
5: 3 FLF-00007 fittings were installed to GSU-25 ADAHRS.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.