03/02/20: 2.17Hrs 1: The four holes on each electrical bracket were tapped 8-32.
03/03/20: 2.25Hrs 2: The left and right wing connectors were attached to F-00034A and F-00034R. 3: FLF-00012 was installed onto F-00034A. 4: HW-00012 was inserted into FLF-00015-1. 5: FLF-00015-1 was installed onto FLF-00012 using super glue, FLF-00016 was test fit into the connector. 6: The AOA line was inserted into FLF-00012. 9: A step drill was used to enlarge the AOA Guide pilot hole to 3/4" in the left FF-00032 side cover.
07/09/20 .75Hrs 7: The F-00034A was installed to the F-01226-L. The F-00034-R was installed to the F-01226-R.
07/10/20 .25Hrs 8: All the cables going to the ES-00077, headset jacks, and GTP 59 and AOA line were secured with tie wrap to the ES-0031.