03/02/20: 1.42Hrs 1: Sanding down the step on the isolator washer was only required on one of them. 2 & 3: The left side headset jacks were installed and tested for continuity. 4: One ES-00301 was installed. 5: The pilot stick connector was installed. 6: The ring ground terminals were attached to the existing hardware. 8: The pitch connector servo was secured with tie-wrap Worked on step 7 by completing every step (1-6) except 2 for the right side of the aircraft.
07/09/20 .50Hrs 7: Steps 1 through 6 were repetead for the right side