Date:  3-3-2020
Number of Hours:  4.50
Manual Reference:  
Brief Description:  42MiS/U-07

3/3/2020 4.50Hrs

1: The ELT mounting tray and its straps were installed onto the fuselage.
2: A battery was installed onto the ELT audio alert.
3: The transmitter was installed and latched.
4: The audio alert was tie-wrapped to F-12107A.
5: ES-00301 was riveted to F-01206A-1