KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-24-2021
Number of Hours:  4.00
Manual Reference:  
Brief Description:  36iS/U-04

19/03/2021 2 hours.
Worked on left side.
1. An ultra fine pen was used to mark the gear leg opening on the U-00001A and U-00001B . Then trimmed 1/16 of the trim line and sanded.
2. There's clearance on the brake line.

24/03/2021 2 hours.
Worked on right side.

Note: The dimentions on the manual were not the end result, the gear leg opening had to be enlarged for a 1/8 clearance between the fairing, brake line and the gear leg.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.