Date:  10-3-2018
Number of Hours:  11.33
Manual Reference:  
Brief Description:  23iS/U-03

10/02/18: 2.5Hrs
10/03/18: 7.83Hrs
1. Two F-01205B were countersunk #40 (four holes each) and #30 (6 holes each)
2. Nutplates were riveted onto F-01205B L&R.
3. F-01205A was riveted to F-01204B L&R.
4. F-01205B L&R, F-01204K-L&R, F-01205C, F-1204G L&R. F-1204F L&R and F-1204C L&R were riveted together.

10/04/18: 1Hrs
5. Four F-01205D and F-01205E were riveted to F-01205A.