KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-28-2019
Number of Hours:  2.66
Manual Reference:  
Brief Description:  21iS/U-24

9/28/2018 2Hrs
1. 8 holes were dimpled #40 on F-01207B-1.
2. 4 nutplates were riveted onto F-01207B-1.
3. F-12108A was riveted onto F-01207B-1.
4. F-1286A L&R was riveted onto F-01207B and F-1206G L&R.
5. F-01268B-L was riveted to F-012868A-L.
6. F-01268B-R was riveted to F-012868A-R.
7. Bushings were installed into the holes of F-01207B.

Step 8 pending (after painting)

11/28/2019 0.66Hrs
8. The section where the F-1204N Fuel tank Pad will be placed was cleaned with alcohol. The adhesive backing from F-01204N was removed and then positioned on the edge of the F-01224-L-1 & -R-1 Baggage Floor flanges according the specifications for a good bond.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.