KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  9-27-2018
Number of Hours:  5.83
Manual Reference:  
Brief Description:  21iS/U-18

09/26/18: 4.83Hrs
1. Top flanges of one F-0121 L&R (most inboard) were dimpled #30.
2. One hole on each of the most outboard step ribs and two holes on F-01202F were dimpled #30
3. Four holes were dimpled #40 on F-01202F.
4. Step rib assemblies were riveted to F-1203A.
5. Temporary bolts were placed in a total of four holes on F-01202.
7. Step rib assembly angles were riveted.
8. Bushings were installed onto the fuselage
9. HW-00014 was riveted top F-01202F

09/27/18: 1Hr
7. Step rib flanges were riveted to F-012012F.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.