KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  9-24-2018
Number of Hours:  7.33
Manual Reference:  
Brief Description:  21iS/U-07

09/21/18: 3.33 hrs
1. Ribs #4 and #5 were dimpled #30 in three nutplate places each.
2. Three holes were dimpled #30 on the middle flange of #4 and #5.
3. One hole was dimpled in the aft flange of #4 and #5.
4. Three nutplates were riveted in the forward flange of #4 and #5
5. Six holes were final drilled #19 on rib #5, five were final drilled #19 on #4 and one was final drilled #12 on rib #4 as a mistake, Van's confirmed clearance that this rib can be worked on despite this mistake.
6. F-1269 was clecoed to rib #3.

9/24/18: 4Hrs
7,8 . Three holes were final-drilled #30, four holes were final-drilled #12 and material was removed in rib #3 as Figure 2 shows.
9. AN52-10R10 screw with called-out hardware and it was given a torque of 28lb/in.
10. Three nutplates were installed in ribs #2, #3, #6, #7.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.