09/19/18: 6.66 Hrs 1. F-01206F-2 was dimpled #40 in only one set of nutplate holes. 2. F-01206F-2 was riveted to F-1206J L&R. 3. F-01206F-2 was riveted to F-01206A-1 only in two places, the manugactured head goes on the flange of F-01206F-2. 4. The bearing bracket assemblies were riveted to F-1206G L&R and to F-1206J L&R. 5. Riveted a nutplate to F-1206F-2. 6. F-1250 were separated. 7. F-1250 L&R were riveted to F-1220A and F-1220B. 8. F-01219-1 were separated
09/20/18: 1.5Hrs 9. Two F-1218 were riveted to F-1220A and F-1220B. 10. F-01219A was countersunk #40 in four places. Flaperon mixer arm was assembled according to steps 11 and 12.