19/03/2021 2 hours. Worked on left side. 1. An ultra fine pen was used to mark the gear leg opening on the U-00001A and U-00001B . Then trimmed 1/16 of the trim line and sanded. 2. There's clearance on the brake line.
24/03/2021 2 hours. Worked on right side.
Note: The dimentions on the manual were not the end result, the gear leg opening had to be enlarged for a 1/8 clearance between the fairing, brake line and the gear leg.