19/03/2021 4.5 hours. Worked on the left side. 1. The U-00001A, U-00001B and two U-00002s were clecoed #30. 2. Material was removed up to the scribe line from the U-00001A and the halves match smoothly. 3. U-00001A and B are aligned and temporaly placed a tape across thwe seam. 4. The bracked hole was transfered to the inside of the U-00001B. 5. A pilot hole was drilled centered of the tire inflation marked. 6. The wheel fairings were match-drilled #40 at each dimples starting from top-center. Each drilled hole was clecoed,