2. Both plastic sleeves were slide foward along the F-01239-1 until they contact the aft end of the snap bushings in the F-01202F-1 then secured to the F-01215L-1 & -R-1 3. Both 10 in plastic sleeves were drilled #40 4. The plastic sleeves were pulled over the shaft of the fork ends and safety wire was put. 5. The af ends of the rudder cables coiled and secured forward of the F-01207B-1 the forward ends of the rudder cables were secured forward of the F-01202F-1