KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-18-2021
Number of Hours:  0.10
Manual Reference:  
Brief Description:  *** 12A-04 pending final assembly

1. MM on the installed equipement list table.
H-STAB FAIRINGS was added to the item column and checked as installed.
1.06lb for weight, 235.324 in for Location/arm and 249.443 in-lb s movement onto the line of H-STAB FAIRINGS.
POH on the optional equipment list table.
H-STABL FAIRINGS was added to the item column and checked as installed.
1.06 lb for weight, 235.324 in for Location/arm and 249.443 in-lb s movement onto the line of H-STABL FAIRINGS
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.