03/18/20: 2.18Hrs 2: The GEA 24 was installed onto the firewall. 5:The 9-pin, 37-pin and 50-pin connectors were connected to the GEA 24.
8/11/20 1.40Hrs 1: The three screws of the GEA 24 were covered with tank sealant. 3: The heads of the screw on the forward side of de fuselage were covered with tank sealant. 4: The Rotax fuse box was reinstalled 5: The 9, 37 and 50 pin d-sub connectors were connected from the WH-00134 RV-12iS Garminn common harness (VFR) to the GEA 24.