Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS B
All
8-30-2020
< Previous Log Entry
Next Log Entry >
Date:
8-30-2020
Number of Hours:
35.30
Manual Reference:
Brief Description:
Left Wing
8/22/20 4.6 Hrs
Left Wing was sanded and placed at the base of the folding shop crane.
8/21/20 12 Hrs
A surface pretreatment (Prekote) was applied to the Left Wing.
8/22/20 4.1 Hrs
Primer and top coat (White Color) was applied to the Left Wing.
8/23/20 7.1 Hrs
Top coat (Gris Color) was applied to the Leftt Wing.
8/30/20 7.5
Top coat (Orange Color) was applied to the Left Wing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
Category
# Logs
# Hours
All
443
3643
.Avionics
52
188
.Empennage
55
331
.Finish
96
569
.Fuselage
115
758
.Inventory
21
92
.PAP
11
1
.Powerplant
39
202
.Service Bulletin
14
15
.Wings
24
249
Batteries Log
1
ECU Cycles log
1
Finish Kit
1
612
None
1
0
Painting process
9
255
PAP
1
Powerplant
2
371
RV-12iS A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.