02/25/20: 1Hr 1: The harness wires were roughly placed onto position. 3: MS2166-1N was installed onto the hole where the hearness is passing through. 5: The HIC connectors were connected to AV-60009.
02/26/20: 1.15Hrs 8 & 9: Three AN931-6-16 grommets were expanded using a socket and a vise.
03/17/20: 0.33Hrs 6: The HIC connectors from the fusebox were connected to AV-60009. 7: The IS Can Bus connector D-sub was changed to one with its retaining standoffs on the backside.
07/09/20 0.49Hrs 2: Wires K6297 and K6298 were connected to the red power leads of the ES CPU Fans.