02/20/20: 0.65Hrs 1: CT-01204 was routed from the tunnel cover assembly to the aft of the fuselage, then secured with the nut and washer supplied. 2: CT-01204 was inserted into F-12108B and secured using the nuts and washers called out.
02/24/20: 0.75Hrs 3: CT-01204 was temporarily secured to two ES-00301 using tie wraps 4-7: CT-00100 was inserted into CT-00100 and with the shut-off valve open it was installed by tightening the screws.