KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-26-2020
Number of Hours:  3.33
Manual Reference:  
Brief Description:  45iS/U-03

12/04/19 2.83 Hrs
Step 1-6. Four 3 in. strips were made from MS12166-1N Grommet. The F-1257B (strips) were secured to the right two F-01257 with a small of RTV.
UHMW tape was applied to the forward face of the lower F-01201F-1 as required.
(3,4 pending)
UHMW tape was applied to the aft face of the lower F-01201G-1.
The SEAL-00003 Spaces were cut and installed. Then the battery surface was cleaned. The latter will have to be repeated because the work done on part F-01201S-1 was the wrong one for the type of battery.

02/26/20 .5 Hrs
7. The ES-ETX900 Earth X Battery was installed using the indicated hardware.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.