Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS B
All
11-15-2019
< Previous Log Entry
Next Log Entry >
Date:
11-15-2019
Number of Hours:
2.30
Manual Reference:
Brief Description:
37iS/U-03
11/16/19 2.3 Hrs
Step1: The lower edges of both L-1 & R-1 forward halves were trimmed to porevent interference with the fuselage skins.
Step 2: The halves of the hinges were cut and sliced to fit in each of their places
The pins and hinges were also bent to give them the desired shape.
Step 3: The end of boh F-01201 J-1 & K-1 and F-12117-L-1 & R-1 hinge pins were grinded to an offset point.
Step 4: The eyelets of both forward asnd aft hinge halves of the F-01201 J-1 & K-1 were beveled using a flat file with smooth edges.
Step 5: All the hinge pins were coated with a dy lubricant.
Step 6: All of the forward hinge halves on the fuselage were installed by inserting thrit hinge pins.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
Category
# Logs
# Hours
All
443
3643
.Avionics
52
188
.Empennage
55
331
.Finish
96
569
.Fuselage
115
758
.Inventory
21
92
.PAP
11
1
.Powerplant
39
202
.Service Bulletin
14
15
.Wings
24
249
Batteries Log
1
ECU Cycles log
1
Finish Kit
1
612
None
1
0
Painting process
9
255
PAP
1
Powerplant
2
371
RV-12iS A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.