Date:  4-13-2020
Number of Hours:  4.55
Manual Reference:  
Brief Description:  39iS/U-13

6/24/2019 1.25Hrs
Step 1. Each C-1212 was mesaured, marked and drilled.
Step 2. The edges of each C-1212 were radiused
Step 3. Two holes were countersuk on each C-1212 to fit a #8 head fllush screw

04/12/2020 0.7 hrs
Step 4. The canopy was unlatched and rotated to open position.

04/13/2020 2.6Hrs
Steps 5. Each guide block were rotated on its screw until the lower outboard corner is tangent to the outside surface of the roll bar frames.
6. The canopy was rotated down to closed position , there was no interference between any screws.