KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  4-13-2020
Number of Hours:  4.63
Manual Reference:  
Brief Description:  39iS/U-11

06/20/19: 1.05Hrs
Step 1. The C-1210 canopy lift handles were fabricated from 3/4 x 3/4 x .063 Aluminum angle. The lift handle was clecoed to the C-1202 canopy skirt. The hole in the canopy skirt was used as a guide for drilling the lift handle.

06/21/19: .48Hrs
Step 2. The C-1202 canopy was placed on the WD-1219 canopy frame and then both parts were clecoed.

04/13/20 3.1Hrs

Step 3. The canopy skirts were riveted to the canop frame.

04/13/20 0.75Hrs
Step4. The canopy was screwed to the frame
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.