01/07/19: 2.76Hrs Steps 1 and 2 were worked on but because of an incident, a hole on F-01240-1 was created so this part number will have to be ordered.
02/02/19: 2Hrs 1. F-01240-1 was curved again to match the canopy rib assemblies and step 2 was worked on again. A note that can be added is that final-drilling should be completed before the first step.
02/05/19: 5Hrs 2 The holes on the forward edge and at the sides of F-01240-1 were final-drilled #17 and dimpled #8. 3. The holes on the aft edge of the same part were dimpled #40. 4. F-00077 L&R were dimpled. 5. F-00078 had two holes on each side countersunk #40 and the part was primed. 6. The nutplates were riveted to F-00078. 7. F-00077 L&R were riveted to F-00078.
02/06/19: 0.25Hrs 8. F-00077 L&R were riveted to F-01240-1.
NOTE: Step 7 of page 29iS/U-11 could be completed before the last step on this page to make things easier.