11/02/18: 3.08 Hrs Steps 2. The R-1205 and WD-1205 were removed and the R-1204 and R-1203-1 were riveted to the R-1202 3. The R-1205 was riveted to the R-1204 and R-1202. The remaining holes on the spar caps were riveted as well 4. The foward flange was removed from the R-01203-1 and the trimmed edge was deburred
03/14/19 .85 Hrs
Step 1. The lower hinge was temporally attached to the V-stab