KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-5-2018
Number of Hours:  5.80
Manual Reference:  
Brief Description:  06-03

11/02/18: 3.6Hrs
1. VS-1212A&B L&R were separated and deburred.
2. VS-1212B L&R were marked with a line at a distance of 5/16 from their upper side.
3. VS-1212B- L&R were placed on VS-1203 using its reference line and were clamped to it.
4. VS-1212A L&R were placed on VS-1203 and were match-drilled #30, VS-1212B L&R were match-drilled #30 as well.
5. VS-1212A&B L&R were match-drilled #30.



11/05/18: 2.25Hrs
6. VS-1212A&B L&R were match-drilled #40.
7. VS-1212A&B L&R were match-drilled #12.
All of the holes were deburred.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.