KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-2-2018
Number of Hours:  1.83
Manual Reference:  
Brief Description:  06-02

Steps 2,3 and 4 do not apply, since we already have wedge tools.
5. A total of 8 holes were final-drilled on VS-1210.
6. VS-1210 were separated.
7. VS-1211 were marked and separated.
8. VS-1211 A&B were clecoed between two VS-1210 and then 5 holes were match-drilled #30 on each one,
9. A bearing was inserted into VS-1211A and then it was riveted to the two VS-1210 that it was match-drilled with.
10. The previous step was performed exactly the same but using VS-1211B.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.