10/19/18: 1.16Hrs 1. The nutplate rivet holes were dimpled in the F-1207A, F-01207C-L-1 & -R-1 and F-01207D-L-1 & -R-1. 2. The F-01207C-L-1 & -R-1 were fluted along three long flanges below the longeron cutout. The holes were aligned with the holes in the F-01270-L-1 & -R-1. 3. The nutplates were dimpled.
10/22/18: 6.58Hrs 4. The nutplates, F-1207A, F-01207C-L-1 & -R-1, F-01207D-L-1 &-R-1, F-01207B and F-01224-L-1 & -R-1 were cleco then riveted. 5.The F-1232B-L &-R were cleco then riveted to the F-1232A.
02/18/20: 0.52Hrs 6 & 8: F-1232A and F-1232B L&R were riveted between each other, to the roll bar and to F-1207A 9. Was reattached.