10/04/18: 1.33Hrs 1. F-1086 and F-1087 were separated.
10/05/18: 5.33Hrs 2. F-1087A and F-1087B were final drilled #40. 3. 6 holes on each of the F-1093 were countersunk. 4. The slot on F-1087 was filed and sanded until the screw mentioned on the manual could move freely. 5. F-1087A&B, F-1092 and F-1093 were riveted together.
10/19/18: 23iS/08: 3Hrs 6. F-1086A, F-1086B, F-1096 and F-01270 L&R were match-drilled #30 then riveted together.
STEP 7 AFTER INTERIORS ARE PAINTED.
08/17/20 .6Hrs Step 7. The vent door subassembly was installed.