KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  5-15-2019
Number of Hours:  10.00
Manual Reference:  
Brief Description:  39iS/U-16, 39iS/U-17, 42MiS/U-14

42MiS/U-14:
The cables that go forward were routed from the cockpit.
The X3 connector was assembled as instructed but Rotax only shipped one screw for its clamp, we've contacted Van's and they instructed finding a similar screw in a hardware shop, no luck so far.
The ring terminals called out were connected to the Fusebox as instructed, The drawing on figure 1 shows cable K-6284 going from the firewall to the generator A grounds but also shows it should be connected to the generator B grounds, we'll confirm about this tomorrow.

The canopy fairing is its last stages, we installed it into the fuselage to confirm there would not be any interference or damage when opening it or closing it. It was removed later and we started removing the resin excess.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.