KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  5-9-2019
Number of Hours:  14.75
Manual Reference:  
Brief Description:  38iS/U-18, 39iS/U-16, 39iS/U-17, 42MiS/U-02, 42MiS

42MiS/U-02:
The holes were deburred as instructed in step 5.

42MiS/U-03:
Steps 1 and 3 were completed, step 2 could not be completed because we are missing two washer locks, they're already ordered.

42MiS/U-06:
The stickers were installed into the control sticks as instructed in step 6.

42MiS/U-08:
Steps 5 through 7, were completed. Step 4 had previously been done. The circumference around the hole for the aft most screw was sanded to remove paint and primer.

The canopy fairing is still being sanded.

We worked on the overflow fuel line from page 38iS/U-18 but it turns out the new dimensions we received don't work either, We'll wait for the new revision with the correct dimensions.






38iS/U-18, 39iS/U-16, 39iS/U-17, 42MiS/U-02, 42MiS
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.