Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
Finish Kit
11-24-2018
< Previous Log Entry
Next Log Entry >
Date:
11-24-2018
Number of Hours:
6.00
Manual Reference:
Brief Description:
37iS/U-03, 37iS/U-05, 37iS/U-06
37iS/U-03:
3: NA
4: NA
5: NA
6: NA
37iS/U-05:
1: NA
2: NA
3: NA
4: NA
5: The fuselage was already leveled.
6: NA
37iS/U-06:
2: This was done tracing the shape of figure 1 onto a block of wood that had a thickness of 3/4.
NOTE: Step 6 on page 37iS/U-04 was worked on but it has not been finished yet.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.