Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
Finish Kit
6-23-2018
< Previous Log Entry
Next Log Entry >
Date:
6-23-2018
Number of Hours:
14.00
Manual Reference:
Brief Description:
Sec 32, Pages 32iS/U-04 to U-09
Flight Controls,
**Page 32iS/U-04**
Was completed:
1. N/A
**Page 32iS/U-05** was completed:
1. N/A
2. We used clamps to force the cushioned clamps to close and to fit the screw.
3. N/A
4. N/A
5. We used the wire that came with our WD-01224 tag as a safety wire.
**Page 32iS/U-06** was completed:
1. N/A
2. As section 5.20 states, when securing pivot points this should only be tight enough to hold the cable in position but let it rotate.
3. N/A
4. N/A
**Page 32iS/U-08** was completed:
1. N/A
2. N/A
3. N/A
On **Page 32iS/U-09** we completed these steps:
1. Take note that only one hole should be countersunk.
2. N/A
3. N/A
4. N/A
6. The common holes between these two parts were #40 so we drilled both of them to #30 in order to rivet.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.