KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  6-4-2018
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Page 17-06

Today we completed steps 2 and 3 of page 17-06 (Right Wing) the same way we completed them on the left wing, by completing these two steps we completed step 4 (17-06),
The one that mentions to repeat steps on the right wing. This time we did not rivet the three holes that will be used for the lighting kit wing extension. On the left wing we removed these and also completed step 1 of page 40-08 and most of step 2 of the same page, only missing match-drilling the holes three holes already on the skin.

Remember to cleco each hole that you drill to make sure the extensions are pressed tight to the skin.
Also, technically, step 4 was completed because our wings were already upside down.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.