Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
7-26-2019
< Previous Log Entry
Next Log Entry >
Date:
7-26-2019
Number of Hours:
2.75
Manual Reference:
Brief Description:
47iS/U-07, 47iS/U-08
47iS/U-07:
The hubs, plates and propeller blades were reinstalled.
47iS/U-08:
The propellers were leveled to the floor using a spirit level, also, an iPhone being used as a digital level was zeroed using the canopy deck as reference.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.