KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  6-14-2019
Number of Hours:  3.00
Manual Reference:  
Brief Description:  53AiS/U-02

53AiS/U-02
All the rivets that interfered with F-12112-1 were removed, it was clecoed and used to match-drill a total of 13 holes #30, four of them, the ones that are used to attach de ADS-B were final-drilled #27.
F-12112-1 was riveted and the ADS-B was installed as instructed.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.