Date:  5-14-2019
Number of Hours:  15.00
Manual Reference:  
Brief Description:  39iS/U-16, 39iS/U-17, 42MiS/U-13

42MiS/U-13:
Steps 1 through 3, 5,6 and 8 were completed.
Step 4 was not completed since we're missing the screws called out.
Step 7 was not completed due to not being able to hold the standoff of the connector, it requires a really small wrench to hold.

Most of the time went into routing the cables.

The canopy fairing kept being sanded and filled with bubbles.