42MiS/U-13: Steps 1 through 3, 5,6 and 8 were completed. Step 4 was not completed since we're missing the screws called out. Step 7 was not completed due to not being able to hold the standoff of the connector, it requires a really small wrench to hold.
Most of the time went into routing the cables.
The canopy fairing kept being sanded and filled with bubbles.