Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
5-8-2019
< Previous Log Entry
Next Log Entry >
Date:
5-8-2019
Number of Hours:
13.83
Manual Reference:
Brief Description:
38iS/U-18, 39iS/U-16, 39iS/U-17, 42MiS/U-02, 42MiS
9:00 - 11:40
1:40-3:40
5:20 - 6:30
The overflow fuel line was cut and beveled as instructed on step 7 of page 38iS/U-18
The canopy fairing is still being sanded, and the whole canopy and frame were removed to start trimming as pages 39iS/U-16 & 17 indicate.
TOOL-0005 was used to match-drill 4 holes into the F-01202B, and two holes were countersunk #30 as instructed on step 2 of page 42MiS/U-02.
Steps 4 through 6 were completed on page 42MiS/U-06.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.