42MiS/U-05: Steps 1 through 5 were completed for the co-pilot stick and steps 1-3 on page 42MiS/U-06 were completed for both sides.
All steps on 42MiS/U-07 were completed, the latches were tie-wrapped as instructed in the ELT manual, although the Van's manual does not instruct to do so.
The overflow fuel line on 38iS/U-18 was reworked because the dimensions given on revision 0 were incorrect, Van's sent provisional dimensions to work with.
The canopy fairing was sanded as instructed on 39iS/U-16