Date:  4-24-2019
Number of Hours:  19.28
Manual Reference:  
Brief Description:  38iS/U-18, 39iS/U-14, 39iS/U-15, 49iS-07, 50iS/U-1

38iS/U-18
Steps 2 and 3. None of the steps specify but the holes were final-drilled #30 so the LP-3 could be installed.

39iS/U-14:
Step 1 was completed once again so we can be prepared for the canopy fairing.

39iS/U-15:
The canopy templates were cut as step 2 instructs.

49iS-07:
Steps 5 and 6 were completed, the hardware was tightened for using 12 in/lbs to set for friction drag.

50iS/U-12:
Steps 7, and 8 were completed for both vent doors, 9 was completed for the left one and started for the right one. We also noticed that the nutplates installed on the left side of the airplane (which can be seen on page 29iS/U-04) were inverted and so we had to swap the type of screw that goes into them, all of this was approved by Van's.