Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
4-23-2019
< Previous Log Entry
Next Log Entry >
Date:
4-23-2019
Number of Hours:
17.36
Manual Reference:
Brief Description:
38iS/U-22, 49iS-05, 49iS-06
38iS/U-22
We started trimming the left wing
49iS-05
The whole page was completed, CT-1204 does not go through the ligthening holes of the throttle arm brackets.
49iS-06
Steps 2 through 7 were completed, the F-01293 had already been painted by this point.
49iS-07
Steps 1 through 4 were completed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.