Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
12-14-2018
< Previous Log Entry
Next Log Entry >
Date:
12-14-2018
Number of Hours:
18.80
Manual Reference:
Brief Description:
50iS/U-07, 50iS/U-08, 50iS/U-10, 50iS/U-11
50iS/U-07:
6: NA
7: A template that can be found on 50iS/U-14 was made to replicate this bend.
8: Torque for both was of 18.44ft/lbs
9: Does not apply for this aircraft.
10: NA
NOTE: Torque for all of the screws that go to the cushion clamps was of 25in/lbs. The one that clamps FF-00022 has not been torqued as specified.
50iS/U-08:
1: NA
2: Instead of drilling on the center of the cap Van's confirmed that a pilot hole that had been drilled into it had to be used for this.
3: NA
4: NA
5: NA
6: NA
7: NA
8: NA
9: NA
10: NA
11: NA
50iS/U-10:
1: NA
2: NA
3: NA
4: NA
50iS/U-11:
1: NA
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.