Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
12-13-2018
< Previous Log Entry
Next Log Entry >
Date:
12-13-2018
Number of Hours:
18.80
Manual Reference:
Brief Description:
37iS/U-19, 37iS/U-20, 50iS/U-05, 50iS/U-07
37iS/U-19:
4: NA
5: Most of this was making sure there were no fiberglass spikes along the edges.
6: This had already been done on page 37iS/U-15, on this step we rounded a bit the corners no minimize stress.
7: NA
8: NA
9: NA
10: NA
11: NA
37iS/U-20:
1: NA
2: NA
3: NA
50iS/U-05:
10: This might have been a lot easier if the orange heat-shield wouldn't have been there.
11: It was torqued to 18.44 ft/lb
12: NA
13: NA
14: NA
15: NA
50iS/U-07:
2: NA
3: We would recommend doing the bends of step 7 before cutting at the specified length
4: We would recommend doing the bends of step 7 before beveling the end of the tube.
5: NA
Preformed radiator hose re-attached to the engine.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.