KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  5-26-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Page 40-13 Light wires

Today steps 2, 3, 4, 5, 6, 7 10 and 11 were carried out, in step 2 a snap was inserted in the hole just made in the bottom of the roll bar assembly, for this step it was necessary to open the hole in the flange part, this was necessary to allow the surface of the bushing to enter completely and achieve anchor to the piece, for this step it was necessary to use a 1/4 drill bit. in step 3 the two lower rivests that hold the F-1231A-FR and F-1231E were removed. In step 4 countersink was made to 3 holes in part F-12124, for this step it was necessary to make a guide plate and the countersink used was 120x30plt.
In the following steps, a match-drill 30 was made to 2 holes between piece F-12124 and 1231A-FR. After the piece F-12124 was removed, deburred and painted with primer, with a drying duration of 30 min later was riveted with rivets LP4-3, finally made the step 10 and 11 in which was made an enlarge the guide hole in the F-1205B to 3/8 using a step drill, then an SB375-3 bushing was inserted.


Team: Alvaro
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.