KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  5-24-2018
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Steps 1 to 6 Page 24iS/U-03

Today, the steps 1 2 3 4 5 6 24iS / U-03 were carried out, in which they started holding the part C-01205A Canopy Block Drill template onto the bottom of the roll bar asembly. After match-drill # 30 was made in the indicated hole, this part is was used as a guide. Afterwards they were countersinked to 3 holes on the bottom of the roll bar aseembly, to be later riveted with rivets cs4-4 these rivets will be below a piece that will be installed later. In step 4 tap # 8-32 was made in 3 holes in the roll bar, where piece C-01205-2 will be installed. For this step, part C-01205-2 was used as a guide to help to locate the bottom surface.
in step 5 a rivet LP4-3 was installed that had not been installed because it was necessary for the previous machining.
Finally in step 6 countersink # 19 was made to the 3 holes of the part C-01205-2, one of them where the surface is declined was made countersink manually. Then this part was screwed to the roll bar assembly with 2 screws AN509-R8-14 and an AN509-R8-10


Team: Alvaro and Andrea
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.