KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-5-2018
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Section 1 started

Team: Alvaro Lopez, Eduardo Duran, Luis Isiordia, Angel Rodriguez, Andrea Limon, Alma Elguezabal

Abscent:Magdalena Rios


Today we started to build our plane, the 20is section of the fuselage. First we deburred the edges and holes of the pieces. Then we started with step one, where we countersink the holes of the nutplate with # 40 countersink, we used a sharpie to indicate each hole and after countersinking it, clecos were placed together with the nutplates K100-8 to later place two rivets CCR264SS-3-2 which are those in the center and those at the ends with nutplates K1000-3 and rivets AN426AD-3-4.
To move forward a little, we made step # 5 drilled to # 30 the Final Drill figure where the plane indicates it.
We advanced little but it was great the first rivets of the fuselage have been placed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.