I have worked a number of hours over the last few weeks on the plane. Working on the static port lines & a number of other items. It is always hard in the Summer to get much time to really work on the RV9 project Other work includes, filberglass tips, and wiring a few 3 pin connectors for the Whelen flasher. Also, put some wiring in the tubing in the wings. Place a small hole in the tubing for wires that may be installed in the location of the bell crank, each wing. This could be used later for Dynon Alt hold or pitot heat. The strings are in place to pull wires at anytime in the life of the RV.