Today I -Removed the Left Hand Side skin and drilled the OB HS710 & HS714 Holes
Started Right Hand Side
-Drilled all rib to spar holes to #30 size except the HS708 -Unclecoed, Deburred holes & Re-Clecoed -Clecoed skin on -Enlarged HS708 holes to #21 -Slipped HS704 & 5 in place and marked holes -Removed and fluted HS405/5 -Marked Centreline on HS404/5 flange -Aligned flange centreline with holes and clamped in place -Drilled aft flange of HS405 to HS603 -Drilled HS609pp to Skin attach holes -Drilled HS405-702-710 and HS405-714-704 holes -Match drilled all remaining holes in Skin -Removed the Right Hand Side skin and drilled the OB HS710 & HS714 Holes