KitLog pro

Powered By Kitlog Pro v2.0

Tarans RV7 Project - VH-TJL
' style=
Date:  7-18-2011
Number of Hours:  3.20
Manual Reference:  HS/DRILL/STEP 2-14
Brief Description:  HORIZONTAL STABILISER - DRILLING HORIZONTAL STABIL

TODAY I
-FINALLY PILOT DRILLED THE FWD FLANGES ON HS405
-DRILLED ALL RIB TO SPAR HOLES TO #30 SIZE EXCEPT THE HS708
-UNCLECOED, DEBURRED HOLES & RE-CLECOED
-CLECOED SKIN ON
-ENLARGED HS708 HOLES TO #21
-SLIPPED HS704 & 5 IN PLACE AND MARKED HOLES
-REMOVED AND FLUTED HS405/5
-MARKED CENTRELINE ON HS404/5 FLANGE
-ALIGNED FLANGE CENTRELINE WITH HOLES AND CLAMPED IN PLACE
-DRILLED AFT FLANGE OF HS405 TO HS603
-DRILLED HS609PP TO SKIN ATTACH HOLES
-DRILLED HS405-702-710 AND HS405-714-704 HOLES
-MATCH DRILLED ALL REMAINING HOLES IN SKIN
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.