KitLog pro

Powered By Kitlog Pro v2.0

Tarans RV7 Project - VH-TJL
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-21-2022
Number of Hours:  3.00
Manual Reference:  7-11
Brief Description:  Left Flap prep/priming

-Continued deburring of right flap
-Found a fair bit of light surface corrosion on skin edges and around holes
-Removed corrosion
-Dimpled as required
Primed with P99 wash primer i'm trying out, didn't come out as well as I had hoped with a fair bit of running but by the end got it figured out and hopefully I can do better next time
-Run out of time to work on the other side
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.